{"id":8776,"date":"2026-11-27T17:59:09","date_gmt":"2026-11-27T17:59:09","guid":{"rendered":"https:\/\/noticias.c3ntro.com\/noticias-blog\/?post_type=noticia&#038;p=8776"},"modified":"2026-11-27T18:43:09","modified_gmt":"2026-11-27T18:43:09","slug":"mexico-business-ponencia-simon-masri","status":"publish","type":"noticia","link":"https:\/\/noticias.c3ntro.com\/noticias-blog\/noticias\/mexico-business-ponencia-simon-masri","title":{"rendered":"Despliegue de capital y competitividad de M\u00e9xico en C3ntros de Datos"},"content":{"rendered":"\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\">Autor: Diego Valverde <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/mexicobusiness.news\/cloudanddata\/news\/capital-deployment-mexicos-data-center-competitiveness\">Nota original<\/a><\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\"><em>M\u00e9xico podr\u00eda captar parte de los 82.500 millones de d\u00f3lares en inversi\u00f3n proyectada en centros de datos hasta 2031, pero el capital global para infraestructura sigue siendo selectivo debido a los cuellos de botella en la transmisi\u00f3n, las demoras en los permisos y la incertidumbre regulatoria. Los desarrolladores deben ofrecer subestaciones el\u00e9ctricas, conectividad de fibra \u00f3ptica de larga distancia y marcos legales claros de 20 a 30 a\u00f1os para competir por el capital institucional.<\/em><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Los fondos globales de infraestructura cuentan con un amplio capital para infraestructura digital, pero M\u00e9xico enfrenta un cuello de botella competitivo debido a que los inversionistas priorizan proyectos a gran escala con suministro el\u00e9ctrico inmediato y regulaciones predecibles. Durante su discurso de apertura en la Cumbre de Centros de Datos de M\u00e9xico 2026, el 25 de noviembre de 2026, Sim\u00f3n Masri, Presidente y Director Ejecutivo de <a href=\"https:\/\/www.c3ntro.com\/\">C3NTRO Telecom<\/a>, describi\u00f3 los requisitos estructurales que M\u00e9xico debe cumplir para convertir la capacidad anunciada en megavatios operativos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Si bien se proyecta que la demanda mundial de centros de datos casi se triplique, pasando de 82 GW en 2025 a 219 GW en 2030, M\u00e9xico opera una base instalada de 279 MW, de los cuales 250 MW se concentran en Quer\u00e9taro. Seg\u00fan datos de la industria citados por Masri de la Asociaci\u00f3n Mexicana de Centros de Datos (MEXDC), la capacidad total podr\u00eda multiplicarse por ocho, hasta alcanzar los 2214 MW en los pr\u00f3ximos cinco a\u00f1os, si se materializan los proyectos anunciados y en construcci\u00f3n, lo que representa una ventana de inversi\u00f3n estimada de 82 500 millones de d\u00f3lares entre 2026 y 2031.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sin embargo, Masri advirti\u00f3 que el capital no escasea, sino que est\u00e1 invertido en otros sectores. Los diez mayores fondos de infraestructura globales cuentan con compromisos por valor de 209.400 millones de d\u00f3lares, mientras que se prev\u00e9 que cinco grandes empresas tecnol\u00f3gicas \u2014Amazon, Microsoft, Alphabet, Meta y Oracle\u2014 inviertan 791.000 millones de d\u00f3lares en gastos de capital solo en 2026. Este gasto anual de los hiperescaladores equivale aproximadamente a 48 veces la inversi\u00f3n proyectada de M\u00e9xico en centros de datos para los pr\u00f3ximos cinco a\u00f1os.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Adem\u00e1s, los mercados de deuda estadounidenses cerraron pr\u00e9stamos para centros de datos por valor de 223.000 millones de d\u00f3lares hasta septiembre de 2026, absorbiendo la capacidad institucional con transacciones para un solo campus, como el paquete de deuda de Meta por valor de 12.000 millones de d\u00f3lares en El Paso, Texas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">&#8220;El capital no escasea; est\u00e1 ocupado. M\u00e9xico tiene que ser f\u00e1cil de entender y f\u00e1cil de aprobar&#8221;, afirma Masri.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Preparaci\u00f3n de subestaciones y cuellos de botella en la fibra \u00f3ptica<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Dentro de la arquitectura de inteligencia artificial de cinco capas \u2014que abarca la energ\u00eda digital, la infraestructura digital, los chips, los modelos y las aplicaciones\u2014, Masri se\u00f1al\u00f3 que M\u00e9xico compite en las dos capas f\u00edsicas fundamentales: la generaci\u00f3n y transmisi\u00f3n de energ\u00eda, y las instalaciones f\u00edsicas como los centros de datos, las redes de fibra \u00f3ptica y los nodos perif\u00e9ricos.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para atraer a proveedores de servicios en la nube a gran escala y a operadores de neocloud, Masri argument\u00f3 que las cartas de factibilidad preliminares de la Comisi\u00f3n Federal de Electricidad (CFE) o del Centro Nacional de Control de Energ\u00eda (CENACE) son insuficientes. Los inversionistas institucionales y los compradores de servicios en la nube requieren subestaciones que est\u00e9n en construcci\u00f3n con fechas de energizaci\u00f3n confirmadas o que ya est\u00e9n energizadas. La construcci\u00f3n de subestaciones de alta tensi\u00f3n requiere una importante inversi\u00f3n inicial y contratistas especializados en ingenier\u00eda, adquisici\u00f3n y construcci\u00f3n (EPC), los cuales a\u00fan son escasos en M\u00e9xico.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large is-resized\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"665\" src=\"https:\/\/noticias.c3ntro.com\/noticias-blog\/wp-content\/uploads\/sites\/2\/2026\/11\/simon.masri-1-1024x665.jpg\" alt=\"Sim\u00f3n Masrio en ponencia de clausura  del Mexico Data Center Summit 2026\" class=\"wp-image-8778\" style=\"aspect-ratio:1.53987167736022;width:699px;height:auto\" srcset=\"https:\/\/noticias.c3ntro.com\/noticias-blog\/wp-content\/uploads\/sites\/2\/2026\/11\/simon.masri-1-1024x665.jpg 1024w, https:\/\/noticias.c3ntro.com\/noticias-blog\/wp-content\/uploads\/sites\/2\/2026\/11\/simon.masri-1-300x195.jpg 300w, https:\/\/noticias.c3ntro.com\/noticias-blog\/wp-content\/uploads\/sites\/2\/2026\/11\/simon.masri-1-767x498.jpg 767w, https:\/\/noticias.c3ntro.com\/noticias-blog\/wp-content\/uploads\/sites\/2\/2026\/11\/simon.masri-1-1536x997.jpg 1536w, https:\/\/noticias.c3ntro.com\/noticias-blog\/wp-content\/uploads\/sites\/2\/2026\/11\/simon.masri-1-2048x1330.jpg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/div>\n\n\n<p class=\"wp-block-paragraph\">La conectividad representa una limitaci\u00f3n paralela. Las cargas de trabajo de IA de alta densidad requieren extensas redes de fibra \u00f3ptica metropolitanas y de larga distancia, y los despliegues de fibra metropolitana en EE. UU. han aumentado de cuatro hilos en 2004 a 16&nbsp;000 en 2026. Los principales operadores y empresas tecnol\u00f3gicas estadounidenses han realizado pedidos anticipados de grandes vol\u00famenes de fibra a fabricantes como Corning, lo que ha extendido los plazos de entrega de los equipos a 52 semanas. Sin rutas de fibra dedicadas, se\u00f1al\u00f3 Masri, la capacidad de potencia disponible no puede comercializarse.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Din\u00e1mica transfronteriza e hitos de ejecuci\u00f3n<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Los cambios geopol\u00edticos en Estados Unidos representan tanto una oportunidad como un riesgo pol\u00edtico para los operadores mexicanos. La oposici\u00f3n local provoc\u00f3 el rechazo de 40 de las 41 propuestas municipales estadounidenses sobre centros de datos durante las elecciones de mitad de mandato de noviembre de 2026, junto con los llamamientos de l\u00edderes del Congreso para una moratoria nacional. Si bien una normativa estadounidense m\u00e1s estricta podr\u00eda impulsar la demanda hacia el sur en el marco del T-MEC, Masri destac\u00f3 una propuesta de la Casa Blanca del 20 de noviembre de 2026 para imponer aranceles a las empresas estadounidenses que construyen centros de datos en el extranjero, dejando sin definir las normas fiscales transfronterizas.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Para demostrar la viabilidad de la ejecuci\u00f3n en M\u00e9xico, Masri cit\u00f3 el proyecto <a href=\"https:\/\/www.c3ntro.com\/infra\/tikva\">Tikva<\/a> de <a href=\"https:\/\/www.c3ntro.com\/\">C3NTRO Telecom<\/a>, una red troncal de fibra terrestre de 2500 km que conecta Quer\u00e9taro con Phoenix, Arizona. Financiado por bancos de desarrollo europeos despu\u00e9s de que los prestamistas nacionales dudaran sobre los activos digitales no inmobiliarios, el corredor est\u00e1 completado en un 84% (con una extensi\u00f3n de 2100 km) y se prev\u00e9 que est\u00e9 listo para entrar en servicio en el primer trimestre de 2027. La ruta integra 30 centros de datos de borde neutrales para operadores en municipios mexicanos desde Nogales hasta Quer\u00e9taro, proporcionando una capacidad inicial de 10 MW, ampliable a 60 MW.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">De cara al futuro, Masri identific\u00f3 cuatro prioridades para captar la inversi\u00f3n a largo plazo en computaci\u00f3n: esquemas de transmisi\u00f3n mixtos entre la CFE y el sector privado, capital especializado para infraestructura, permisos de ventanilla \u00fanica con plazos vinculantes para derechos de paso y comunicaci\u00f3n p\u00fablica que aclare la gesti\u00f3n del agua y la energ\u00eda limpia. Si M\u00e9xico ejecuta su actual plan de 2 GW para 2030, concluy\u00f3 Masri, el sector deber\u00eda aspirar a alcanzar los 10 GW de capacidad instalada para 2035.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Fuente: <a href=\"https:\/\/mexicobusiness.news\/\">Mexico Business News<\/a> <\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Contacto:<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>C3ntro Telecom<\/strong><br>Email: pr@c3ntro.com<br>Tel: +1 305 402 1499<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\" \/>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Autor: Diego Valverde Nota original M\u00e9xico podr\u00eda captar parte de los 82.500 millones de d\u00f3lares en inversi\u00f3n proyectada en centros de datos hasta 2031, pero el capital global\u2026<\/p>\n","protected":false},"author":12,"featured_media":8777,"template":"","categoria_noticia":[2],"class_list":["post-8776","noticia","type-noticia","status-publish","has-post-thumbnail","hentry","categoria_noticia-infra"],"_links":{"self":[{"href":"https:\/\/noticias.c3ntro.com\/noticias-blog\/wp-json\/wp\/v2\/noticia\/8776","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/noticias.c3ntro.com\/noticias-blog\/wp-json\/wp\/v2\/noticia"}],"about":[{"href":"https:\/\/noticias.c3ntro.com\/noticias-blog\/wp-json\/wp\/v2\/types\/noticia"}],"author":[{"embeddable":true,"href":"https:\/\/noticias.c3ntro.com\/noticias-blog\/wp-json\/wp\/v2\/users\/12"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/noticias.c3ntro.com\/noticias-blog\/wp-json\/wp\/v2\/media\/8777"}],"wp:attachment":[{"href":"https:\/\/noticias.c3ntro.com\/noticias-blog\/wp-json\/wp\/v2\/media?parent=8776"}],"wp:term":[{"taxonomy":"categoria_noticia","embeddable":true,"href":"https:\/\/noticias.c3ntro.com\/noticias-blog\/wp-json\/wp\/v2\/categoria_noticia?post=8776"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}